Factory Facility

Manufacturing Workflow & Quality Assurance

From raw metallurgical tube cutting to 100% final dynamic test drives, explore how Shandong CCB New Energy Machinery Co., Ltd. guarantees precision engineering for worldwide fleets.

End-to-End Production Traceability

Standardized 12-Stage In-House Manufacturing

Unlike simple modular assemblers, Shandong CCB New Energy Machinery Co., Ltd. conducts frame cutting, CNC pipe bending, structural welding, automated electro-coating, dual-stage assembly lines, and rigorous FQC inspections under one 14,200 m² verified roof.

Machining Mounting Brackets and Axle Couplings Stage 02

Machining

Dedicated milling and drilling stations forming structural brackets, suspension anchor points, and mechanical steering fixtures.

MillingThread CNC
Pipe Bending for Vehicle Safety Cages and Canopies Stage 03

Pipe Bending

Multi-angle cold bending for roll cages, front bumper guards, and golf cart canopy uprights ensuring repeatable structural strength.

Cold Arc FormingSafety Rollcage
Welding and Polishing of Reinforced Chassis Frame Stage 04

Welding & Polishing

Jig-positioned shielded arc welding followed by seam grinding and deburring to eliminate stress fractures across rough terrains.

Jig ClampingSmooth Polished
Electrophoretic Spraying and Protective Paint Coating Stage 05

Spraying

Multi-step phosphate washing, electrophoretic primer dipping, and electrostatic topcoat baking built for high humidity and seaside resistance.

Anti-CorrosionUV Resistance
Assembling Stage 1 Mechanical Underbody and Drivetrain Stage 06

Assembling 1

Primary rolling chassis integration: installation of heavy-duty front independent suspension, hydraulic disk brakes, transmission, and AC motors.

Suspension MountAxle Fitting
Assembling Stage 2 Electrical Harness and Body Panels Stage 07

Assembling 2

Secondary integration: wire harness routing, LiFePO4 battery pack docking, ABS body panels, digital dashboard consoles, and luxury seating.

Battery PackCabin Fitment
Quality Inspection and System Diagnostic Testing Stage 08

Inspection

Systematic electronic diagnostic scans, insulation resistance checks, steering geometry alignment, and braking pressure assessments.

Brake TorqueInsulation Check
Automated CNC Cutting Machine Center Stage 09

Cutting Machine

High-efficiency automated industrial cutting machinery ensuring batch-to-batch structural uniformity for high-volume OEM orders.

CNC MachineBatch Uniformity
Heavy-duty Hydraulic Bending Machine Center Stage 10

Bending Machine

Heavy hydraulic press brake tooling forming sheet steel battery enclosures, cargo bed flooring, and underbody skid plates.

Hydraulic PressBattery Trays
Dedicated CNC Pipe Bending Machine Center Stage 11

Pipe Bending Machine

Dedicated multi-axis servo pipe bending equipment maintaining curve symmetry on overhead structures and front A-arms.

Servo PrecisionCurvature Control
Enterprise Quality Philosophy

Three Pillars of Quality Verification

Every electric cart, UTV, and sightseeing shuttle bus shipped by Shandong CCB New Energy Machinery Co., Ltd. satisfies strict international safety guidelines.

In-Coming QC (IQC)

  • 100% metallurgical verification of raw steel and extruded aluminum.
  • LiFePO4 lithium cell capacity, cycle life, and BMS board load testing.
  • Wiring harness flame retardancy and waterproof plug certification.

In-Process QC (IPQC)

  • X-ray and ultrasonic checks on high-stress chassis weld seams.
  • Paint adhesion cross-hatch testing and salt spray corrosion tests.
  • Suspension alignment and wheel hub bearing torque validation.

Final QC (FQC / OQC)

  • Dynamic track road testing: slope climbing, full throttle, and regenerative braking.
  • High-pressure monsoon rain chamber testing for electronics waterproofing.
  • Reinforced container steel crating and moisture barrier inspection.

Schedule a Live Video Factory Audit

Interested in inspecting our robotic lines or reviewing quality logs? Our engineering team offers real-time digital factory walk-throughs and sample evaluations for wholesale distributors.

Contact Us TÜV Rheinland Audited Facility · Response within 12h